WORK IN PROGRESS, BUILDING OF THE TECHNICAL PLATFORM OF THE HENRI MONDOR HOSPITAL CENTRE, AURILLAC, FRANCE

April 2018

Kardham Architecture began the transformation of the historically suburban Henri Mondor hospital site. The stakes of the project are to weave strong links with the existing building, both functionally and spatially, while creating a unitary and coherent whole. At the heart of the project is the technical platform that brings together the operating theatre, the endoscopy and the maternity ward.